Pharmaceutical production hall during fit-out

Capabilities ยท 02

Procurement, Installation & Commissioning

From specification to a plant running trial batches, held under a single contract with a single party accountable for the outcome.

01

Execution Scope

Specified, bought, shipped, installed, qualified.

  • 01

    Specification and vendor qualification

    User requirement specifications, vendor assessment and technical evaluation, so the machine that arrives is the machine the process needs rather than the one that quoted lowest.

  • 02

    Procurement as principal

    We contract for the equipment ourselves and pass the manufacturer's warranty through to the client. One counterparty, one point of accountability, and no gap between the party who specified the machine and the party who bought it.

  • 03

    Factory and site acceptance testing

    FAT witnessed before dispatch, so faults are found while the equipment is still with its maker, and SAT on site after installation.

  • 04

    Export logistics

    Packing, shipping, export documentation and site delivery, including into destinations where the last leg is the hardest part of the journey.

  • 05

    Erection and installation

    Mechanical installation, orbital welding for hygienic pipework, and tie-in to site utilities.

  • 06

    Qualification

    Installation, operational and performance qualification executed and documented as a formal, auditable exercise.

  • 07

    Commissioning and trial batches

    Commissioning, trial batch execution, formulation recipes and technology transfer, taking the plant from mechanically complete to actually producing.

  • 08

    Workforce training

    Training the client's own operators, technicians and quality staff to run the plant, so the handover is a handover and not a dependency.

02
Stainless process vessel being positioned in an empty production room
Process vessel installation

Single Point of Accountability

We buy the equipment. Not the client.

On most projects the contractor advises and the client purchases, which means that when a machine underperforms the client is left arguing with a manufacturer they have never met. We contract as principal and pass the manufacturer's warranty through. If a machine does not meet the specification we wrote, that is our problem to resolve.

03

Machinery Supply Record

Equipment supplied as a standalone scope.

500+
Machines & utility systems supplied
Supplied across more than a dozen countries in Africa, the Middle East and South Asia.
Machinery supply reach

Equipment categories supplied

  • Granulation
  • Compression
  • Tablet Coating
  • Capsule Filling
  • Blister & Strip Packing
  • Bottle & Liquid Filling
  • Tube Filling
  • Vial Washing & Filling
  • Lyophilisers
  • HVAC & Air Handling
  • Purified Water & WFI Systems
  • Boilers & Plant Utilities

Markets served

West Africa

  • Nigeria
  • Ghana
  • Benin
  • Togo
  • Mali
  • Senegal

East & Central Africa

  • Kenya
  • Tanzania
  • Uganda
  • Ethiopia
  • Cameroon

Middle East

  • Oman
  • Iraq
  • Lebanon
  • Turkey

Markets listed are machinery supply destinations, not facilities we built. They are stated at set level and are not attributed to any individual project or client.

Planning a pharmaceutical facility?

Tell us the dosage platforms you are considering, the market you are registering in and the status of your site. We will tell you what the project actually involves.

Start the Conversation